Multiple Protection APF Active Power Filter With Touchable Button Operation
Features:
APF (Active Power Filte)is with neutral current first compensating, simultaneous compensation of Harmonic and reactive power, order of harmonic selectable compensating, system parameter settings online, RS485 standard, Modbus RTU communication protocol
Specification:
Output current capacity(A) | 45 | 75 | 100 | 150 | 200 | |
AC Input |
Rated voltage | 380×(1±15%)V | ||||
Rated Frequency | 50×(1±1%)Hz | |||||
Rated topology | Three-phase three-wire | |||||
Technical
|
orders of harmonic compensating |
Within 5~13: selectable Or within 5~25: all compensation |
||||
Compensating rate (THDILoad-THDIS)/ THDILoad | ≥85% | |||||
Reactive power compensating |
Determined by priority
|
|||||
Full response time | ≤20ms | |||||
Overload Protection | Automatically limited to the rated output current | |||||
Active power loss | <5%Rated capacity | |||||
Noise | <65dB | |||||
Environment & |
Operating temperature | -10OC~+45OC | ||||
Storing Temperature | -20OC~+65OC | |||||
Relative humidity | <90%(25OC) | |||||
Working Mode | Automatically or manually | |||||
Communication Interface | RS485 PC interface, remote control function | |||||
Operation Display | LCD monitoring panel; parameters setting online; touchable button operation; multi-parameter display | |||||
Display Accuracy | ±2%FS | |||||
Expansion Ability | Directly connect in parallel with the same model machine | |||||
Protection | Grid over-voltage, Grid under-voltage, Grids missing phase, Grid wrong phase, the Machine over current and overheating | |||||
Protection level | IP20 | |||||
dimension mm(W×H×D) | 600×1200×400 | 600×2200×600 | 800×2200×600 | |||
Non-standard sizes can be customized | ||||||
Weight(kg) | 150 | 200 | 400 |
Our Service:
1. 2% spares together with shipment for urgent issue.
2. All of the necessary documents such as drawing, manual etc.
3. We will provide the online service by mail
4. We can despatch engineer to assist you solve the problem if necessary (But you are requested to pay for the cost of ticket, hotel etc. ). you can despatch engineer(s) to our company to get training.
5. One year warranty